S01 / Front door · intent-routed
For independents · 5–500 wells · the operators the majors forgot

What’s biting your fleet?

Tell us what hurts. We’ll show you which piece of SRABS is designed to fix it, and what it costs you to find out. No procurement RFP. No SCADA replatform on supported setups. One well, thirty days.
S02 / Pick your pain · click one
S03 / Our answer
SRABS Pump
Hardware · anti-buckling rod pump

Buckling. The silent tax on every barrel.

The mechanical fix. A drop-in anti-buckling rod pump that keeps the string in tension where it would otherwise buckle. The buckling problem, tackled at the source, not modeled after the fact.
−0%
rod failures · modelled
Modelled
On a 100-well fleet: 43 workovers avoided a year. Design target: zero parted rods on autopilot.
schematic · SRABS Pump
FIG. 01 Rod lift, elevation and wellbore sectionA conventional beam pumping unit drives the rod string down the wellbore to the SRABS anti-buckling pump, set at 2,000 ft.FIG. 01ROD LIFT · ELEVATIONA1,5002,000 ftTDTVBARRELPLUNGERSVDETAIL ASCALE NTS123456ITEMPARTS LIST1PRIME MOVER2GEARBOX3WALKING BEAM4POLISHED ROD5ROD STRING6SRABS PUMPanti-bucklingDWG FIG. 01SCALE NTSSHEET 1/1SRABSSURFACE
FIG. 01 Rod lift, elevation and wellbore sectionA conventional beam pumping unit drives the rod string down the wellbore to the SRABS anti-buckling pump, set at 2,000 ft.FIG. 01ROD LIFT · ELEVATIONA1,5002,000 ftTDTVBARRELPLUNGERSVDETAIL ASCALE NTS123456ITEMPARTS LIST1PRIME MOVER2GEARBOX3WALKING BEAM4POLISHED ROD5ROD STRING6SRABS PUMPanti-bucklingDWG FIG. 01SCALE NTSSHEET 1/1SRABSSURFACE
S04 / Built for the operators the majors forgot
Who SRABS is for

If you run 5 to 500 wells,
SRABS is built for you.

The supermajors pay $2M/year for fleet-optimization software half their engineers haven’t logged into this quarter. We built SRABS for the operators who can’t, and who feel every workover in the P&L.
Defined

SRABS is a brownfield operating system for independent operators of mature rod-pumped wells: an anti-buckling rod pump, an acoustic fluid-level instrument and an AI control layer, bought as one stack or one piece at a time.

No SCADA required

Echo is an edge device. Plug it in. Done.

Per-well subscription

No 7-figure platform fees. You pay per producing well.

One pilot, one well, 30 days

We baseline, run autopilot, hand you the data. You decide.

No rip-and-replace

Brain talks to your existing VSDs, Lufkin, Eaton, ABB and more, confirmed in a technical check.
S05 / If you want the full picture
The whole stack, in one diagram

Two instruments. One brain.

We mechanically stop buckling in the rod. We listen down the well with sound. Then a control layer reads both and runs the pump for you. The whole stack, or any piece.
1 · hardware
2 · hardware
3 · software
01 / Hardware
The pump

SRABS Pump

Anti-buckling rod pump
A mechanically re-engineered sucker rod pump that keeps the rod string in tension where it would otherwise buckle. The buckling problem, tackled at the source.
OriginLeading European universities
Patents6 granted
RetrofitDrop-in · API spec
02 / Hardware
The listener

SRABS Echo

Acoustic multi-measurement · edge
An automated acoustic edge device. Reads fluid level, bubble point, reservoir pressure & pump conditioning, from a single signal, fully remote. Works with any artificial-lift system.
Measures4 well states
ModeAutomated · remote
HeritageAcquired acoustic IP
03 / Software
The brain

SRABS Brain

AI control & SCADA optimization
A physics-informed control layer that reads the pump, Echo and your existing SCADA, predicts buckling, retunes the VSD, and runs the well inside your guardrails. We close the loop. You keep the override.
Latency< 60 s loop
DeployYour cloud or ours
CoverageAll AL systems
Buy the whole stack, or just the piece you need. Echo & Brain run on any artificial-lift system.
S06 / Outcomes that pass procurement
−0%
rod failures · modelled
+0%
oil on uplift wells · modelled
0.0mo
payback · modelled
Modelled for a typical 100-well independent · run your own numbers ↗
S07 / Voice
“It’s the first piece of oilfield software I’ve bought where the line salesman wasn’t the most expensive part.”
── The review we’re building toward · every 38-well independent
S08 / Pilot CTA

One well. Thirty days. Then you decide.

We instrument, baseline, run autopilot, and hand you a comparison report against the well next door. No commitment. No procurement gauntlet.
30-day pilot · no rip-and-replace
No procurement gauntlet · 1 business day reply